logo

Cement Blanket for Muddy Road Paving - Quick-Drying, Wear-Resistant Temporary & Permanent Road Solution

80㎡
MOQ
Inquire anytime
giá bán
Cement Blanket for Muddy Road Paving - Quick-Drying, Wear-Resistant Temporary & Permanent Road Solution
Đặc trưng Bộ sưu tập Mô tả sản phẩm Yêu cầu báo giá
Đặc trưng
Thông số kỹ thuật
Vật liệu: Sợi dệt và bột xi măng
Chiều rộng: 4m
Chiều dài: 20m-50m
Làm nổi bật:

quick-drying cement blanket

,

wear-resistant temporary road solution

,

permanent road paving cement blanket

Thông tin cơ bản
Nguồn gốc: Trung Quốc
Hàng hiệu: JIANYI
Chứng nhận: ISO9001
Thanh toán
chi tiết đóng gói: Bao bì bên ngoài chống nước và chống bụi
Thời gian giao hàng: 5-8 ngày làm việc
Điều khoản thanh toán: T/T
Khả năng cung cấp: 600t/tháng
Mô tả sản phẩm
Cement Blanket for Muddy Road Paving
Product Overview

Our Cement Blanket is a high-strength, wear-resistant paving solution designed to transform muddy, impassable roads into stable, drivable surfaces quickly. Engineered with a reinforced fiberglass base and high-density cement core, this innovative material hardens rapidly upon water application to create a rigid road surface with exceptional load-bearing capacity.

Key Performance: Supports vehicles up to 5-10 tons after full curing
Application Scenarios

This versatile road paving solution is ideal for multiple applications where stable surfaces are essential:

  • Rural muddy road improvement and maintenance
  • Construction site temporary access roads
  • Farmland and agricultural access roads
  • Emergency road construction in disaster-stricken areas

The cement blanket effectively resolves road impassability issues caused by rain, snow, or heavy usage, ensuring reliable transportation of agricultural products, construction materials, and emergency supplies. Suitable for both temporary applications and permanent road improvements with proper edge reinforcement.

Construction Process
1 Road Preparation: Clear the muddy road surface, remove stagnant water, and level the roadbed. Fill potholes with soil or gravel as needed for a stable foundation.
2 Unfolding & Paving: Roll out the cement blanket along the road direction, ensuring complete coverage of the road width. Overlap adjacent sheets by 15-20cm and secure edges with steel nails or gravel piles.
3 Hydration: Spray or pour water evenly across the blanket until fully saturated. Use sprinklers for efficient coverage on large areas.
4 Curing: Allow the road to dry for 24-36 hours. Light vehicles can pass after initial curing, with full load-bearing capacity achieved within 7 days. For permanent applications, consider adding a gravel or asphalt top layer as needed.
Sản phẩm khuyến cáo
Hãy liên lạc với chúng tôi
Người liên hệ : Ms. Zhang
Tel : 86-13332517898
Ký tự còn lại(20/3000)